Local Governments Are the Real Power Players: Franchise Expiration Dates Are Your Leverage
|
|
4
|
13
|
July 6, 2026
|
|
India's Fixed-Charge Debate: A Rider by Another Name, and Ratepayers Pay the Bill
|
|
4
|
13
|
July 5, 2026
|
|
Con Edison Cut Power on 9,800 Queens Customers During a Heat Wave. That's a Policy Choice, Not an Engineering Necessity
|
|
8
|
19
|
July 5, 2026
|
|
PJM's Heat Dome Stress: Ratepayers Pay Twice for a Grid That Can't Keep Up
|
|
4
|
10
|
July 5, 2026
|
|
Tamil Nadu's fixed charges on industrial power: a captive premium that raises production costs
|
|
4
|
11
|
July 5, 2026
|
|
Preference Power and the Yardstick: What the BPA Contract Renewal Reveals About Public Power's Enduring Bargain
|
|
4
|
16
|
July 5, 2026
|
|
Pakistan's HESCO Celebrates 66 Feeders With Lights On While Millions Gape at Dark Poles
|
|
4
|
13
|
July 5, 2026
|
|
California's second solar carve-up: another 40% export cut would push payback past 12 years and kill rooftop demand, but the real target is the rate design itself
|
|
6
|
21
|
July 5, 2026
|
|
Western governors' $60B transmission plan: who builds, who profits, who pays?
|
|
4
|
16
|
July 5, 2026
|
|
VEICHI's C&I Microgrid Launch: The Real Story Is the Cost Collapse Making Storage a Load-Bearing Asset
|
|
4
|
15
|
July 5, 2026
|
|
World Bank Lends $1.02B to Break the Philippines' Fossil Fuel Dependency, A Template for Buying Down Risk
|
|
4
|
17
|
July 5, 2026
|
|
Kerala's Grid Battery Blitz: Who Wins When the Utility Builds the Storage Instead of You?
|
|
4
|
9
|
July 5, 2026
|
|
Poland’s 300 MW Battery Deal: Who Captures the Value When the Utility Isn’t the Buyer?
|
|
4
|
15
|
July 5, 2026
|
|
Meta's Louisiana Solar Robots Are a Bright Spot, But Who Pays for the Grid Behind Them?
|
|
4
|
17
|
July 5, 2026
|
|
Indonesia's Three-Pronged Plan to Reach 100% Electrification: Grid Extension, Mini-Grids, and Solar Home Systems
|
|
4
|
20
|
July 5, 2026
|
|
Hut 8's $16.8B Texas Deal: Confidential Contracts and the Ratepayer Risk Behind the AI Boom
|
|
4
|
11
|
July 5, 2026
|
|
How a 5 kW Rooftop Solar System in Karwar Cut an Office Bill by 80% and Sold Surplus to the Grid
|
|
4
|
9
|
July 5, 2026
|
|
Henrico County's Conservation Plea Hides a Ratepayer Subsidy for Hyperscalers: Who Signed the Confidential Contracts?
|
|
4
|
14
|
July 5, 2026
|
|
Vermont's Standby Oil Plants Cost $4M a Year, and That's the Cheap Part
|
|
4
|
13
|
July 5, 2026
|
|
Caste Data Request in Gruha Jyothi Scheme: A Red Flag for Universal Electricity Subsidy Design
|
|
4
|
14
|
July 5, 2026
|
|
Brookfield's $25 Billion Bloom Energy Bet: Onsite Power for Big Tech, but Who Pays When the Grid Is Bypassed?
|
|
4
|
13
|
July 5, 2026
|
|
Philippines Senate President Tells Utilities: Stop Stalling Rooftop Solar
|
|
4
|
16
|
July 5, 2026
|
|
The Nigerian Village That Lit Up While U.S. Towns Stay Dark: What a 120 kW Mini-Grid Proves
|
|
4
|
17
|
July 5, 2026
|
|
Fatehabad lineman loses hand as utility staff fail to de-energize line: another death by deferred safety protocol
|
|
4
|
17
|
July 5, 2026
|
|
July Fourth outages: another stress test the grid failed, and the payout history that explains why
|
|
4
|
21
|
July 5, 2026
|
|
Utility-Scale Solar Economics: Why the Largest Farm Is Not Your Cheapest Path
|
|
4
|
10
|
July 5, 2026
|
|
India's smart meter rollout meets consumer resistance as bills rise: Maharashtra utility denies link
|
|
4
|
11
|
July 5, 2026
|
|
PJM emergency order: data centers burned firm capacity while ratepayers paid for it
|
|
7
|
18
|
July 5, 2026
|
|
Kerala Regulator Approves KSEB Power Purchases, Flags Excessive Financial Burden
|
|
4
|
11
|
July 5, 2026
|
|
Emergency Orders for PJM Mask a Deeper Grid Neglect: Under-Maintained Infrastructure Meets a Heat Dome
|
|
4
|
13
|
July 5, 2026
|